Permits
A permit is required prior to performing work on public sewer infrastructure or private sewer laterals.
To apply for a sewer permit, view the "How to Apply" tab below.
Events requiring a permit include but are not limited to:
- Pressure Tests
- Partial or Full Replacements
- Repairs, Clean Outs, Backflow Prevention Devices, etc.
- New Connections, New Construction, Remodels
- Septic-to-Sewer Conversions
- Public Sewer Extensions
- Pool Drains, Discharge Permits
- Abandonment
Grant and Loan funding are available. Learn more here Version OptionsPermitsHeadline.

Contractors must submit a complete packet including:
- Sewer Permit Application: Download here.
- Video Inspection: DVD or flash drive.
- Video Inspection Report Form.
- Site Plan Sketch. View samples: Residence Sketch and HOA Sketch.
- Payment (checks only). See our fee schedule.
For remodels and new construction, submit a set of building plans here.
Complete applications can be mailed in or dropped off at our office during business hours. Incomplete applications will be rejected.
Ordinance Compliance
On May 22, 2024, RVSD adopted Ordinance No. 93, repealing Ordinance No. 92. The ordinance covers fees for permits, inspections, new connections, and remodels. Version Opt
RVSD Fees
Permit fees are non-refundable and are adjusted annually on July 1. View our fee schedule here Version OptionsPermitsHeadline Fees.
CMSA Fees
We also collect capacity fees on behalf of CMSA. View CMSA's fee schedule here Version OptionsPermitsHeadline.
If you are planning to add an Accessory Dwelling Unit (ADU) to your property, be aware that permit and capacity fees may apply. An ADU is defined as a separate, attached or detached residential unit that does not exceed 1,200 square feet. Under Ordinance 93, ADUs are classified into four distinct types. Refer to the descriptions below to determine whether your project will be subject to capacity charges. To view the current fee schedule, click on the "Fees" tab.
Type 1:
Constructed within the existing interior space and exterior walls of a single-family residence (includes Junior ADUs). No capacity charges.
Type 2:
Constructed by expansion or addition to an existing single-family residence or accessory structure. Capacity charges.
Type 3:
Constructed by conversion of an existing, detached accessory structure. No capacity charges.
Type 4:
Newly constructed detached ADU on the same residential parcel. Capacity charges.
DISCLAIMER: The information in the examples above is for general illustrative purposes only and should not be relied upon for any particular property or as a basis for any financial or other commitments. Property owners are strongly encouraged to consult a professional regarding site-specific conditions and obligations.
Before Hiring
Visit the California Department of Consumer Affairs Contractors State License Board website for information here Version OptionsPermitsHeadline. Make sure any plumber you hire is licensed and familiar with District standards and procedures.
Local Contractors
View a List of Local Contractors here Version OptionsPermitsHeadline. Contractors may also schedule a pre-construction site meeting with a District Inspector to discuss standards, specifications, and requirements.
Public Sewer Extensions (PSX)
Download the PSX application by clicking the link. Please contact us regarding procedures, requirements and permit applications to extend District sewer pipes to accommodate new development. To view RVSD Standard Specifications & Drawings and Approved Materials visit here.
Annexation Process
Process and procedure to transfer sewer service to the District from a parcel not currently served by RVSD. View the Annexation Process (PDF).